1 Perry Parkway · New Mos Eisley · North shore of Lake Tiberius

Perry Industries, Inc.

The complete plan set for a three-building chemical manufacturing campus: two SPCC plans, a PSM program, a Risk Management Program, a hazardous waste contingency plan, an emergency action plan, an emergency response plan, six safety data sheets and the facility drawings that tie them together.

Perry Industries is fictitious. Its chemistry, hazards and regulatory obligations are real.

Founded2002
Campus22 acres
ProductsAwesomeness, Brilliance
Receiving waterLake Tiberius
Documents13 + 4 drawings
UpdatedOctober 2026
Prepared bySYNTO

The campus

Three operations share one property on Perry Parkway. Each runs its own building and keeps its own plans; the emergency action plan covers all three.

PI-C-001 — Campus site plan and evacuation mapPI-C-001 · Select to enlarge

A residential neighborhood sits across Perry Parkway to the north, about 400 ft from the flammable tank farm and about 600 ft from the ammonia storage area. Every storm inlet on the property drains to Outfall 001 and Lake Tiberius, a navigable water.

Gates
Gate 1 (Building A), Gate 2 (Building B, 24-hour security), Gate 3 (Building C)
Assembly
AA-1 "Rivendell", AA-2 "Shire", AA-3 "Hoth"
Alarms
Evacuate, shelter in place, take cover, lockdown, all clear
Fire dept.
New Mos Eisley FD Station 7, about 2 miles, hazmat team
Outfall
001 to Lake Tiberius

Buildings and their plans

Each operation keeps the plans its own inventory and processes require; the emergency action plan covers all three.

A
SYNTO GroupR&D and engineering · SYNTO Group, LLC

Formulation lab, bench-scale pilot lab, fragrance and stability lab, and the engineering offices. About 18 people, days, Monday to Friday. Makes nothing for sale. R&D is developing Excellence, a peroxide-based cleaner; its raw material, Hydrogen Peroxide 35%, is kept in oxidizer cabinet OX-1.

PI-A-101 — Building A floor planPI-A-101 · Select to enlarge
B
Perry's Awesomeness FactoryChemical plant · Perry Industries, Inc.
PI-B-101 — Building B SPCC facility diagramPI-B-101 · Select to enlarge
C
Honey Badger LogisticsWarehouse, shipping and fleet fueling · Honey Badger Logistics, LLC

Five docks, the truck and trailer yard, a fleet of 12 tractors and the diesel fueling area. Forklifts run on propane. About 24 people plus drivers, Monday to Saturday.

PI-C-201 — Building C SPCC facility diagramPI-C-201 · Select to enlarge

Which plans apply where

Plans in force at each building, with the regulation each one is written under.

PlanBuilding A · SYNTO GroupBuilding B · Awesomeness FactoryBuilding C · Honey Badger
Emergency Action Plan
29 CFR 1910.38
YesYes, with small-release annexYes
SPCC Plan
40 CFR 112
Not requiredPE-certified, 12,030 galTier I, 10,000 gal
Process Safety Management
29 CFR 1910.119
NoThunderbolt Solvent SystemNo
Risk Management Program
40 CFR Part 68
NoPolyjuice Base, Program 2No
LQG Contingency Plan
40 CFR 262 Subpart M
SAA-1 and SAA-2HWA and points of generationNo
Emergency Response Plan
29 CFR 1910.120(q)
Building B ERT respondsBuilding B ERT, ERP-B-001Building B ERT responds
Chemical Hygiene Plan
29 CFR 1910.1450
Yes, not postedNoNo

Safety data sheets

Supplier SDSs for four raw materials, and Perry Industries SDSs for the two products made from them.

* Brilliance in a single package of 12,500 lb or more ships as an RQ hazardous substance. See Section 14 of its SDS.

Scenarios

Spill scenes for class. Each one has the story, the scene facts, the SDS and the drawings with the spill marked.

Drawings

The site plan and the three facility diagrams referenced by the plans. Select a drawing to view it full size; grid references on the border match the plans.

PI-C-001 — Campus Site Plan and Evacuation MapPI-C-001 · Select to enlarge
PI-A-101 — Building A — SYNTO Group Floor PlanPI-A-101 · Select to enlarge
PI-B-101 — Building B — Perry's Awesomeness Factory SPCC Facility DiagramPI-B-101 · Select to enlarge
PI-C-201 — Building C — Honey Badger Logistics SPCC Facility DiagramPI-C-201 · Select to enlarge

People in the plans

Who answers the phone when something happens. Building B control room: ext. 0, (555) 555-0110. Gate 2 security, 24 hours: (555) 555-0112.

NameTitlePlan rolesPhone
Mike PerryFounder & Chief Awesomeness OfficerManagement approval of all plans(440) 336-0262
Hari SeldonPlant Manager, Building BApproves Building B plans; signs the LQG 15-day report(555) 555-0107
Dawnn PerryPresident, Honey Badger LogisticsSelf-certified the Building C SPCC Plan(833) 727-7699
Steve ReskoERT Leader, Building BPrimary Emergency Coordinator; SPCC response coordinator; leads the ERT; owns the Emergency Response Plan(555) 555-0101
Marty McFlyNight Shift Supervisor, Building BAlternate Emergency Coordinator #1; night ERT lead; first call after 11:00 p.m. and on weekends(555) 555-0105
Jenn ReskoProduction Supervisor, Brilliance LineAlternate Emergency Coordinator #2; specialist employee for Polyjuice Base (Emergency Response Plan)(555) 555-0102
Montgomery ScottMaintenance Manager, Building BAlternate Emergency Coordinator #3; mechanical integrity(555) 555-0103
Malcolm ReynoldsProduction Supervisor, Awesomeness LineThunderbolt Solvent System operator training; hot work permits, R-101 room and tank farm(555) 555-0111
Sarah ConnorPackaging SupervisorEvacuation warden, packaging and HWA(555) 555-0113
Dana ScullyEHS Manager, Building BSPCC accountable person; RMP program manager; LQG and EAP plan owner; ERT member on call(555) 555-0104
Doug HeasleyProcess Controls EngineerPSM Coordinator; management of change; specialist employee for Thunderbolt (Emergency Response Plan)(555) 555-0106
Kara ThraceLead Operator, Thunderbolt Solvent SystemOperator response to small releases(555) 555-0109
Ellen RipleyFleet & Fueling Supervisor, Honey BadgerSPCC accountable person, Building C(555) 555-0130
Hikaru SuluDispatch Supervisor, Honey BadgerAlternate to Ellen Ripley(555) 555-0132
Fred WeaverDirector, SYNTO Group R&DBuilding A EAP coordinator(555) 555-0120
Arthur DentLab Manager, SYNTO GroupChemical Hygiene Officer(555) 555-0121
Lauren FagaSenior Formulation ChemistBuilding A evacuation warden(555) 555-0122
Wendy WeaverDirector of Human ResourcesQuestions about the EAP; training records(555) 555-0142
Kaitlyn Perry, RNOccupational Health NurseMedical duties under the EAP; ERT medical surveillance and fit testing(555) 555-0143
Brian PhillipsVP Sales & MarketingMedia and public inquiries(555) 555-0144
Sarah B. Wood, PEEHS Consulting ServicesCertified the Building B SPCC Plan(330) 689-9164
Mike SheavesSheaves Environmental Response24-hour spill cleanup and waste removal(555) 555-0177

Perry Industries is a fictitious company created for SYNTO training. Not a real facility. Not for use as a plan, SDS or record for any real facility, and not to be reproduced outside SYNTO training. The chemistry, the hazards and the regulations are real.

© 2026 SYNTO. Provided for SYNTO training. Not for reuse or redistribution.