Scenario S-8 · Perry's Awesomeness Factory (Building B)

Bleach mixed with Brilliance during cleanup

Packaging, Building B.

Day and time
Tuesday, 11:00 a.m.
Material
Brilliance and an unlabeled liquid (crew says bleach)
How much is out
Nothing more spilled. The bucket is giving off a gas.
Weather and wind
72 °F, sunny. Wind from the southeast at 7 mph.

The scene

It is Tuesday, 11:00 in the morning, day shift in Perry's Awesomeness Factory, Building B. Two cleanup crew members are mopping up a Brilliance spill from the filling line in packaging. Someone pours liquid from an unlabeled white jug into the mop bucket, and the crew says it was bleach. The bucket starts giving off a sharp, choking smell that is spreading through packaging, and it has not let up. Both crew members are coughing, and one has watery eyes and is short of breath. They leave the area and call Sarah Connor. The bucket is still sitting in packaging. Outside it is 72 degrees and sunny, with the wind from the southeast at 7 miles an hour.

Scene facts

Tap a heading to open it.

When, where and what

Day, time and shiftTuesday, 11:00 a.m. Building B day shift.
WherePackaging, Building B. PI-B-101 grid E2.
Inside or outsideInside.
What spilled (name on the label)Brilliance (ammoniated surface polish), mixed in a mop bucket with what the crew says was chlorine bleach from an unlabeled jug.
What it was inA mop bucket.
How much the container holdsAbout 5 gallons. It has about 3 gallons in it.
Who was there and what they were doingTwo cleanup crew members were mopping up a Brilliance spill from the filling line.
What happenedSomeone poured liquid from an unlabeled jug into the mop bucket. The crew says it was bleach.
How much is outNothing more spilled. The bucket is giving off a gas.
Is it still leaking?Yes. The bucket keeps giving off gas; it has not slowed.
What it spilled onWet concrete floor with Brilliance residue.
Which way it is runningNot running. The gas is spreading through the packaging area.
What you see right nowA sharp, choking smell around the bucket. An unlabeled white jug lying next to it. Both crew members are coughing; one has watery eyes and is short of breath.
Did anyone get it on them?Yes. Both cleanup crew members breathed it.
People on site right nowBuilding B: about 42 (day shift), including 6 ERT members. Building A: about 18. Building C: about 24 plus drivers.
Weather and wind72 °F, sunny. Wind from the southeast at 7 mph.
What is nearbyThe Brilliance filling line. Door B-3, with spill kit SK-16 beside it. The HWA to the east.
What has been done so far, and who has been calledThe two crew members left the area and called Sarah Connor.

Plans and SDS

These are the plans that apply to this scene. Read them to find what to do.

Your instructor will give you the SDS for this material.

Maps

The red circle marks the spill. Tap a drawing to open it full size, then zoom in. The enlarged view has its own graphic scale in feet.

scenario s 8 zoom
PI-B-101 — enlarged view
scenario s 8 b
PI-B-101 — full drawing
scenario s 8 campus
PI-C-001 — campus site plan