Building B — Large Quantity Generator

Contingency Plan

Hazardous waste contingency plan, emergency coordinators and the quick reference guide for responders.

Regulation40 CFR 262 Subpart M
EPA IDPIX000000042
RevisionRev. 3
DateMarch 14, 2026
Primary emergency coordinatorSteve Resko, ERT Leader
Jump to a section
  1. Table of Contents
  2. 1. Purpose, Applicability and Implementation
    1. 1.1 Purpose (262.260(a))
    2. 1.2 When the Plan Is Carried Out (262.260(b))
    3. 1.3 Applicability (262.250 and 262.17(a)(6))
    4. 1.4 Relationship to the SPCC Plan and Other Plans (262.261(b))
    5. 1.5 Facility Description
  3. 2. Hazardous Wastes Handled
  4. 3. Preparedness and Prevention
    1. 3.1 Maintenance and Operation of the Facility (262.251)
    2. 3.2 Required Equipment (262.252)
    3. 3.3 Testing and Maintenance of Equipment (262.253)
    4. 3.4 Access to Communications or Alarm System (262.254)
    5. 3.5 Aisle Space (262.255)
  5. 4. Arrangements with Local Authorities (262.256 and 262.261(c))
  6. 5. Emergency Coordinators (262.261(d) and 262.264)
    1. 5.1 Emergency Coordinator List
    2. 5.2 Coverage at All Times (262.264)
    3. 5.3 Qualifications and Authority (262.264)
    4. 5.4 Emergency Coordinator Duties
  7. 6. Emergency Procedures — Emergency Coordinator Checklist (262.265)
    1. 6.1 Step 1 — Alarm and Call for Help (262.265(a))
    2. 6.2 Step 2 — Identify the Release (262.265(b))
    3. 6.3 Step 3 — Assess Hazards (262.265(c))
    4. 6.4 Step 4 — Required Notifications (262.265(d); 40 CFR 302.6; EPCRA 304)
    5. 6.5 Step 5 — Contain and Prevent Spread (262.265(e))
    6. 6.6 Step 6 — Monitor Shut-Down Equipment (262.265(f))
    7. 6.7 Step 7 — Recovered Waste After the Emergency (262.265(g))
    8. 6.8 Step 8 — Before Restarting (262.265(h))
    9. 6.9 Step 9 — Record and Report (262.265(i))
    10. 6.10 Contents of the 15-Day Written Report (262.265(i))
  8. 7. Evacuation Plan (262.261(f))
    1. 7.1 Alarm Signals
    2. 7.2 Assembly Areas
    3. 7.3 Evacuation Routes and Alternate Routes
  9. 8. Emergency Equipment List (262.261(e))
    1. 8.1 Communications and Alarm Systems
    2. 8.2 Fire Protection and Water Supply
    3. 8.3 Spill Control Equipment
    4. 8.4 Monitoring, Protective and Decontamination Equipment (ERT Room by the Control Room)
  10. 9. Plan Copies, Review and Amendment
    1. 9.1 Copies and Quick Reference Guide (262.262)
    2. 9.2 Amendment (262.263)
    3. 9.3 Training (262.17(a)(7))
  11. Appendix A — Incident Log (Operating Record Entry, 262.265(i))
  12. Appendix B — 15-Day Written Report Template (262.265(i))
  13. Appendix C — Facility Diagram
  14. Appendix D — Quick Reference Guide for Responders (262.262(b))
Document controlApprovals, revision record, distribution
EPA ID No.PIX000000042
Generator statusLarge Quantity Generator (about 1,800 kg hazardous waste per month)
Revision3
Effective dateMarch 14, 2026
Primary Emergency CoordinatorSteve Resko, ERT Leader, (555) 555-0101
Plan ownerDana Scully, EHS Manager, (555) 555-0104
Related plansBuilding B SPCC Plan (certified March 14, 2026); Campus Emergency Action Plan Rev. 4 (March 14, 2026)

Approval

This contingency plan is adopted for the hazardous waste generation and accumulation areas operated under EPA ID No. PIX000000042. Management commits the personnel, equipment and money needed to carry it out, and each Emergency Coordinator listed in Section 5 has authority to commit those resources.

Name and titleSignatureDate
Mike Perry, Founder and Chief Awesomeness Officer, Perry Industries, Inc.
Hari Seldon, Plant Manager, Building B
Dana Scully, EHS Manager, Building B

Revision Record

Rev.DateDescription of changeApproved by
0March 2, 2015First contingency plan for the 90-day hazardous waste accumulation area (HWA).Mike Perry
1November 20, 2018Plan reissued under 40 CFR 262 Subpart M. Quick reference guide issued to NMEFD, police, hospital and LEPC.Mike Perry
2February 10, 2023Emergency Coordinator list updated; Marty McFly added as an alternate. Caustic washwater tank TK-HW1 added to the equipment and waste lists.Mike Perry
3March 14, 2026SK-10 added to the equipment inventory. Emergency equipment inventory updated. CERCLA and EPCRA notification steps added to Section 6. Quick reference guide reissued to responders.Mike Perry

Table of Contents

1. Purpose, Applicability and Implementation 4

1.1 Purpose (262.260(a)) 4

1.2 When the Plan Is Carried Out (262.260(b)) 4

1.3 Applicability (262.250 and 262.17(a)(6)) 4

1.4 Relationship to the SPCC Plan and Other Plans (262.261(b)) 4

1.5 Facility Description 5

2. Hazardous Wastes Handled 5

3. Preparedness and Prevention 6

3.1 Maintenance and Operation of the Facility (262.251) 6

3.2 Required Equipment (262.252) 6

3.3 Testing and Maintenance of Equipment (262.253) 7

3.4 Access to Communications or Alarm System (262.254) 7

3.5 Aisle Space (262.255) 8

4. Arrangements with Local Authorities (262.256 and 262.261(c)) 8

5. Emergency Coordinators (262.261(d) and 262.264) 9

5.1 Emergency Coordinator List 9

5.2 Coverage at All Times (262.264) 9

5.3 Qualifications and Authority (262.264) 10

5.4 Emergency Coordinator Duties 10

6. Emergency Procedures — Emergency Coordinator Checklist (262.265) 10

6.1 Step 1 — Alarm and Call for Help (262.265(a)) 10

6.2 Step 2 — Identify the Release (262.265(b)) 10

6.3 Step 3 — Assess Hazards (262.265(c)) 11

6.4 Step 4 — Required Notifications (262.265(d); 40 CFR 302.6; EPCRA 304) 11

6.5 Step 5 — Contain and Prevent Spread (262.265(e)) 12

6.6 Step 6 — Monitor Shut-Down Equipment (262.265(f)) 12

6.7 Step 7 — Recovered Waste After the Emergency (262.265(g)) 13

6.8 Step 8 — Before Restarting (262.265(h)) 13

6.9 Step 9 — Record and Report (262.265(i)) 13

6.10 Contents of the 15-Day Written Report (262.265(i)) 13

7. Evacuation Plan (262.261(f)) 13

7.1 Alarm Signals 14

7.2 Assembly Areas 14

7.3 Evacuation Routes and Alternate Routes 14

8. Emergency Equipment List (262.261(e)) 15

8.1 Communications and Alarm Systems 15

8.2 Fire Protection and Water Supply 16

8.3 Spill Control Equipment 16

8.4 Monitoring, Protective and Decontamination Equipment (ERT Room by the Control Room) 19

9. Plan Copies, Review and Amendment 19

9.1 Copies and Quick Reference Guide (262.262) 19

9.2 Amendment (262.263) 20

9.3 Training (262.17(a)(7)) 20

Appendix A — Incident Log (Operating Record Entry, 262.265(i)) 22

Appendix B — 15-Day Written Report Template (262.265(i)) 24

Appendix C — Facility Diagram 25

Appendix D — Quick Reference Guide for Responders (262.262(b)) 26

SECTION 1Purpose, Applicability and Implementation

1.1 Purpose (262.260(a))

This plan is designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. Lake Tiberius, a navigable water, borders the campus to the south, and all campus storm inlets drain to it through Outfall 001.

1.2 When the Plan Is Carried Out (262.260(b))

The provisions of this plan are carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten human health or the environment. The Emergency Coordinator decides whether an event meets that test. When in doubt, the plan is carried out.

1.3 Applicability (262.250 and 262.17(a)(6))

As a large quantity generator, Perry Industries must comply with Subpart M as a condition of accumulating hazardous waste without a permit (262.17(a)(6)). Subpart M applies to the areas of a large quantity generator where hazardous waste is generated or accumulated on site (262.250). Satellite accumulation areas operated by a large quantity generator must also meet Subpart M (262.15(a)(8)). This plan covers:

AreaLocationWastes
90-day hazardous waste accumulation area (HWA)Building B, south side, between packaging and Lab/QCD001 drums; D002 tank TK-HW1; lab-pack drums awaiting pickup
Thunderbolt Solvent System (point of generation)Building B, R-101 room; recovery receiver V-102D001 spent Thunderbolt and R-101 still bottoms
Awesomeness blending line (point of generation)Building B, Awesomeness lineD002 caustic washwater from kettle cleanout
Satellite accumulation areas SAA-1 and SAA-2Building A (SYNTO Group) labsD001 and D002 lab waste, moved to the HWA

Building C (Honey Badger Logistics) does not generate or accumulate hazardous waste and is not covered, except that its employees follow the Campus EAP signals.

1.4 Relationship to the SPCC Plan and Other Plans (262.261(b))

40 CFR 262.261(b) allows a generator that already has an SPCC Plan under 40 CFR part 112, or some other emergency or contingency plan, to amend that plan to incorporate hazardous waste management provisions sufficient to comply with Part 262, and allows one contingency plan that meets all regulatory standards.

Perry Industries keeps this contingency plan as a separate document that cross-references the Building B SPCC Plan (262.261(b)). Together with the plans below it covers Building B as follows:

PlanWhat it coversShared with this plan
Building B SPCC Plan (40 CFR 112), certified March 14, 2026 by Sarah B. Wood, PEOil: T-3 mineral oil, T-4 diesel, TX-1/TX-2, T-6, drums. Discharge response and reporting for oil.Spill kits SK-1 to SK-6, drain covers, the flammable tank farm dike, Sheaves contract, contact list
Campus Emergency Action Plan Rev. 4 (29 CFR 1910.38)Reporting, alarm signals, evacuation routes, assembly areas, accounting for people, shelter in place.Evacuation signals, routes and assembly areas (Section 7) are the same as the EAP
Building B Emergency Response Plan (29 CFR 1910.120(q))How the 12-member ERT responds to releases, including PPE, decontamination and site control.ERT does the hands-on response the EC directs under Section 6
PSM Program, Thunderbolt Solvent System (29 CFR 1910.119)Emergency shutdown ESD-101 and operating procedures for T-1/R-101.Stopping the process under 262.265(e)

Where the plans overlap, this plan governs anything involving hazardous waste. A single event can trigger more than one plan, such as a fire in the HWA that also reaches oil; the EC carries out every plan that applies.

1.5 Facility Description

Perry's Awesomeness Factory (Building B) is the chemical plant on the Perry Industries campus, 1 Perry Parkway, New Mos Eisley, on the north shore of Lake Tiberius. A residential neighborhood lies across Perry Parkway to the north, about 400 ft from the flammable tank farm. The flammable tank farm (T-1 Thunderbolt, T-3 mineral oil) is northeast of Building B; Polyjuice Base (T-2, 25% aqueous ammonia) is in a separate diked ammonia storage area east of Building B. Neither holds hazardous waste. Building B runs two shifts Monday through Friday (days 6:00 a.m.–2:30 p.m., about 42 people; nights 2:30 p.m.–11:00 p.m., about 28 people). On weekends 1 operator and 1 security officer are on site. Security staffs the Gate 2 house 24 hours a day. The facility diagram is in Appendix C (Figure C-1, Drawing PI-B-101).

SECTION 2Hazardous Wastes Handled

Waste (plain terms)EPA codeHazardContainer / locationMost on site at one time
Spent Thunderbolt (isopropyl alcohol) solvent and R-101 still bottomsD001Ignitable. Flammable liquid; Thunderbolt flash point 53 °F (12 °C) closed cup, boiling point 181 °F (83 °C); vapors heavier than air, can travel to an ignition source. Eye and respiratory irritant; high vapor levels cause dizziness and drowsiness.55-gal closed-head steel drums, HWA, on spill containment pallets40 drums (2,200 gal)
Caustic washwater from Awesomeness kettle cleanout (pH 12.5 or higher)D002Corrosive. Strong alkali (sodium hydroxide). Causes severe skin and eye burns. Reacts with acids, giving off heat. Attacks aluminum, tin and zinc.TK-HW1, 2,500-gal polyethylene tank, HWA, in a curbed containment area2,500 gal
Lab waste (lab packs) from SYNTO Group labsD001, D002Small containers of ignitable solvents and corrosive solutions.SAA-1, SAA-2 (Building A); lab-pack drums at HWAUp to 55 gal at each SAA; up to 2 lab-pack drums at the HWA

The facility does not generate acute hazardous waste. No hazardous waste is treated on site. All waste is shipped off site on manifest by Sheaves Environmental Response within 90 days.

Incompatible materials near the HWA

Ignitable D001 waste and corrosive D002 waste are kept apart in the HWA. The D002 tank sits inside its own curbed containment so a leak cannot reach the D001 drums. Alkaline caustic waste is listed as potentially incompatible with acids and reactive metals in Appendix V to Part 265. No acids or acid wastes are kept in Building B.

SECTION 3Preparedness and Prevention

3.1 Maintenance and Operation of the Facility (262.251)

The facility is maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. Practices that do this include:

  • Containers kept closed except when adding or removing waste; drums on containment pallets; labeled and dated.
  • Weekly inspection of the HWA container area (262.17(a)(1)(v)), recorded by Dana Scully or her designee.
  • Daily inspection of tank TK-HW1, its overfill controls, monitoring data and containment (265.195, via 262.17(a)(2)); see Section 3.3.
  • No smoking, open flames or hot work in or near the HWA without a hot work permit. "No Smoking" signs posted at the HWA (262.17(a)(1)(vi)(B)).
  • Drums of D001 grounded and bonded during transfer. Non-sparking tools in SK-1 (main aisle just outside the R-101 room door) and SK-5.
  • D001 drums are kept at least 50 ft from the property line (262.17(a)(1)(vi)(A)).
  • D002 tank TK-HW1 has a high-level alarm, a level gauge and curbed secondary containment.
  • Floor drains in the HWA are sealed. Storm inlets SI-1 and SI-2 have drain covers staged at SK-2, SK-4 and SK-6.
  • Spill kits SK-1 to SK-20 are stocked to the inventory in Section 8, inspected monthly with the SPCC checklist, and restocked after every use by Montgomery Scott (Building B), Arthur Dent (Building A) and Ellen Ripley (Building C).

3.2 Required Equipment (262.252)

262.252 requirementHow it is met
(a) Internal communications or alarm system capable of immediate emergency instruction (voice or signal)Building fire alarm (pull stations at every exit, including the HWA door) and campus mass notification system with voice capability, controlled from the control room and Gate 2. Plant radios on Channel 1.
(b) Device to summon emergency assistance from police, fire, or emergency response teamsWall phone at the HWA entrance (dials 911 directly). Plant radio carried by anyone handling hazardous waste; control room relays to 911.
(c) Portable fire extinguishers, fire control equipment, spill control equipment, decontamination equipmentABC extinguishers; alcohol-resistant AR-AFFF foam cart with SK-1 in the main aisle just outside the R-101 room door; spill kits SK-1 to SK-6 and SK-9 to SK-20 (inventory and absorbent capacity in Section 8); 95-gal overpack drums at SK-1, SK-5, SK-11, SK-12, SK-15, SK-16 and the ERT room; safety showers with eyewashes SS-1 to SS-4; ERT decontamination kit.
(d) Water at adequate volume and pressure for hose streams, foam, sprinklers or water sprayWet-pipe sprinklers throughout Building B including the HWA; hydrants FH-1 (Gate 2), FH-2 (east of Building B, between the flammable tank farm and the ammonia storage area), FH-3 (Building C east).

The complete equipment list with location, physical description and capabilities is in Section 8 (262.261(e)).

3.3 Testing and Maintenance of Equipment (262.253)

EquipmentFrequencyBy whom / record
Fire alarm system and pull stationsPull stations monthly; system annuallyMaintenance; alarm contractor. Campus EAP Section 4.4
Mass notification system (shelter, all clear)Every two monthsMontgomery Scott. Test log
HWA wall phone and plant radiosWeekly, with the HWA inspectionDana Scully or designee. Weekly HWA inspection form
Portable fire extinguishersVisual monthly; maintenance annually (1910.157(e)(2), (e)(3))Maintenance; extinguisher contractor. Tag and log
AR-AFFF foam cartMonthly visual; annual foam and hose checkERT. ERT equipment log
Sprinkler systemPer the fire protection contractor scheduleContractor. Inspection reports
Spill kits SK-1 to SK-6, SK-10 and SK-13 to SK-17 (Building B); SK-9 and SK-18 to SK-20 (Building A); SK-11 and SK-12 (Building C)Monthly, with the SPCC checklist; restocked after every useMontgomery Scott (Building B); Arthur Dent (Building A); Ellen Ripley (Building C). Spill kit checklist
Safety showers SS-1 to SS-4 (with eyewashes)Weekly activationArea operators. Tag on unit
SCBA and spare cylinders, Level B suits, decontamination kit, overpack drumsMonthly (SCBA per 29 CFR 1910.134(h)(3)(iii))ERT. ERT equipment log
Portable 4-gas/PID meters, ammonia tubes and pumpCalibration monthly; bump check before each useMontgomery Scott. Calibration log
TK-HW1 tank system: high-level alarm and gauge readings, overfill/spill controls, aboveground portion of the tank, curbed containment and surrounding areaOnce each operating day (40 CFR 265.195(a) and (b), applied to LQG tanks by 262.17(a)(2))Area operator; daily tank inspection log kept in the operating record (265.195(g))

Equipment found defective is tagged out and repaired or replaced right away. Records are kept in the operating record.

3.4 Access to Communications or Alarm System (262.254)

  • Whenever hazardous waste is being poured, mixed, transferred or otherwise handled, everyone involved has immediate access to an alarm or emergency communication device: the HWA pull station and wall phone, a plant radio, or voice or visual contact with another employee who has one (262.254(a)).
  • If only one employee is on the premises while the facility is operating, that employee carries a plant radio and a cell phone able to call 911 (262.254(b)). On weekends both the operator and the security officer carry radios. Still bottoms are drummed at the end of the Friday night shift batch and moved to the HWA by the night shift before leaving; no hazardous waste is handled on weekends except in an emergency.

3.5 Aisle Space (262.255)

Aisle space is kept in the HWA to allow the unobstructed movement of personnel, fire protection equipment, spill control equipment and decontamination equipment to any area of facility operation in an emergency. Facility practice: drums are stored no more than two pallets deep with an aisle of at least 3 ft between rows, the main HWA aisle and the HWA doorways are kept clear, and nothing is stored within reach of the extinguisher, eyewash or pull station. Aisle space is checked on the weekly HWA inspection.

Perry Industries is a fictitious company created for SYNTO training. Not a real facility. Not for use as a plan, SDS or record for any real facility, and not to be reproduced outside SYNTO training. The chemistry, the hazards and the regulations are real.

© 2026 SYNTO. Provided for SYNTO training. Not for reuse or redistribution.

Plans like these for your facility

SYNTO writes SPCC plans, PSM and RMP programs, hazardous waste contingency plans and emergency action plans, and trains the people who use them.

syntonetwork.com