Tier I Qualified Facility SPCC Plan
This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in §112.3(g)(1). This template addresses the requirements of 40 CFR part 112. Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a facility attended fewer than four hours per day, at the nearest field office. When making operational changes at a facility that are necessary to comply with the rule requirements, the owner/operator should follow state and local requirements (such as for permitting, design and construction) and obtain professional assistance, as appropriate.
Facility Description
| Facility Name | Honey Badger Logistics, LLC (Building C) |
| Facility Address | 1 Perry Parkway (Building C, entered at Gate 3) |
| City / ZIP | New Mos Eisley 00042 |
| County | Tiberius |
| Tel. Number | (555) 555-0130 (Fleet & Fueling Supervisor) |
| Owner or operator Name | Honey Badger Logistics, LLC (wholly owned subsidiary of Perry Industries, Inc.) |
| Owner or operator Address | 1 Perry Parkway |
| City / ZIP | New Mos Eisley 00042 |
| County | Tiberius |
| Tel. Number | (833) 727-7699 (Dawnn Perry, President) |
Description of operations. Building C is the Honey Badger Logistics warehouse, with five shipping docks, a truck and trailer yard, a fleet of 12 tractors, and a diesel fueling area. The facility operates 5:00 a.m. to 3:30 p.m., Monday through Saturday, with about 24 employees plus drivers. Diesel fuel is stored in two 5,000-gallon double-wall aboveground tanks (D-1 and D-2) and dispensed into fleet tractors at dispenser island DI-1. Forklifts run on propane. Lubricants are kept in containers smaller than 55 gallons.
Facility boundary. Building C shares the Perry Industries campus on the north shore of Lake Tiberius with Buildings A and B. Under the 112.2 definition of facility, contiguous buildings under the same owner or operator may be considered separate facilities. Building C is operated separately by Honey Badger Logistics, LLC and is its own SPCC facility. Storm inlet SI-3, south of the fueling island, drains to Outfall 001 and Lake Tiberius, a navigable water. SI-4 (west drive) is upgradient of Building C and not threatened by Building C operations.
I. Self-Certification Statement (§112.6(a)(1))
The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply with the SPCC requirements:
I, Dawnn Perry, certify that the following is accurate:
- I am familiar with the applicable requirements of 40 CFR part 112;
- I have visited and examined the facility;
- This Plan was prepared in accordance with accepted and sound industry practices and standards;
- Procedures for required inspections and testing have been established in accordance with industry inspection and testing standards or recommended practices;
- I will fully implement the Plan;
- This facility meets the following qualification criteria (under §112.3(g)(1)):
a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and
b. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no two discharges as described in §112.1(b) each exceeding 42 U.S. gallons within any twelve month period in the three years prior to the SPCC Plan self-certification date, or since becoming subject to 40 CFR part 112 if the facility has been in operation for less than three years (not including oil discharges as described in §112.1(b) that are the result of natural disasters, acts of war, or terrorism); and
c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000 U.S. gallons.
7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by §112.7(a)(2) (environmental equivalence) and §112.7(d) (impracticability of secondary containment) or include any measures pursuant to §112.9(c)(6) for produced water containers and any associated piping;
8. This Plan and individual(s) responsible for implementing this Plan have the full approval of management and I have committed the necessary resources to fully implement this Plan.
I also understand my other obligations relating to the storage of oil at this facility, including, among others:
- To report any oil discharge to navigable waters or adjoining shorelines to the appropriate authorities. Notification information is included in this Plan.
- To review and amend this Plan whenever there is a material change at the facility that affects the potential for an oil discharge, and at least once every five years. Reviews and amendments are recorded in an attached log [See Five Year Review Log and Technical Amendment Log in Attachments 1.1 and 1.2.]
- Optional use of a contingency plan. A contingency plan: (a) may be used in lieu of secondary containment for qualified oil-filled operational equipment, in accordance with the requirements under §112.7(k), and; (b) must be prepared for flowlines and/or intra-facility gathering lines which do not have secondary containment at an oil production facility, and; (c) must include an established and documented inspection or monitoring program; must follow the provisions of 40 CFR part 109; and must include a written commitment of manpower, equipment and materials to expeditiously remove any quantity of oil discharged that may be harmful. If applicable, a copy of the contingency plan and any additional documentation will be attached to this Plan as Attachment 2.
I certify that I have satisfied the requirement to prepare and implement a Plan under §112.3 and all of the requirements under §112.6(a). I certify that the information contained in this Plan is true.
| Signature: | |
| Name: | Dawnn Perry |
| Title: | President, Honey Badger Logistics, LLC |
| Date: | January 12, 2026 |
Management approval (§112.7, introductory paragraph)
Honey Badger Logistics, LLC is a wholly owned subsidiary of Perry Industries, Inc. The parent company approves this Plan and commits the resources needed to implement it, including the outside response contractor listed in Table G-8.
| Approved by: | Mike Perry, Founder & Chief Awesomeness Officer, Perry Industries, Inc. |
| Signature: | |
| Date: | January 12, 2026 |
Qualification basis. Aggregate aboveground oil storage capacity counted under 112.1(d)(2)(ii) is 10,000 gallons: D-1 (5,000) and D-2 (5,000). Neither tank is larger than 5,000 gallons. Truck and tractor fuel tanks are motive power containers and are excluded (112.1(d)(2)(ii)(B) and (d)(7)). Lubricant containers under 55 gallons are excluded (112.1(d)(5)). Propane is not oil. The facility has had no single discharge as described in 112.1(b) over 1,000 gallons and no two such discharges over 42 gallons in the three years before January 12, 2026. The fueling area has been in service since April 2016.
II. Record of Plan Review and Amendments
Five Year Review (§112.5(b))
Complete a review and evaluation of this SPCC Plan at least once every five years. As a result of the review, amend this Plan within six months to include more effective prevention and control measures for the facility, if applicable. Implement any SPCC Plan amendment as soon as possible, but no later than six months following Plan amendment. Document completion of the review and evaluation, and complete the Five Year Review Log in Attachment 1.1. If the facility no longer meets Tier I qualified facility eligibility, the owner or operator must revise the Plan to meet Tier II qualified facility requirements, or complete a full PE certified Plan.
Reviews completed March 22, 2021 and January 12, 2026 (Attachment 1.1). Next five-year review due: January 12, 2031.
| Table G-1 Technical Amendments (§§112.5(a), (c) and 112.6(a)(2)) | |
|---|---|
| This SPCC Plan will be amended when there is a change in the facility design, construction, operation, or maintenance that materially affects the potential for a discharge to navigable waters or adjoining shorelines. Examples include adding or removing containers, reconstruction, replacement, or installation of piping systems, changes to secondary containment systems, changes in product stored at this facility, or revisions to standard operating procedures. | ☒ |
| Any technical amendments to this Plan will be re-certified in accordance with Section I of this Plan template. [§112.6(a)(2)] [See Technical Amendment Log in Attachment 1.2] | ☒ |
Changes that end Tier I eligibility (112.6(a)(2)). Adding any oil container of 55 gallons or more would raise the aggregate capacity above 10,000 gallons, and replacing D-1 or D-2 with a tank larger than 5,000 gallons would exceed the Tier I container limit. Either change ends Tier I eligibility. Before such a change, Ellen Ripley notifies Dawnn Perry, and within six months following preparation of the amendment the Plan is rewritten either as a Tier II Plan under 112.6(b) (if the facility still meets 112.3(g)(2)) or as a PE-certified Plan under 112.7 and Subpart B.
III. Plan Requirements
1. Oil Storage Containers (§112.7(a)(3)(i))
| Table G-2 Oil Storage Containers and Capacities | ||
|---|---|---|
| This table includes a complete list of all oil storage containers (aboveground containersᵃ and completely buried tanksᵇ) with capacity of 55 U.S. gallons or more, unless otherwise exempt from the rule. For mobile/portable containers, an estimate number of containers, types of oil, and anticipated capacities are provided. | ☒ | |
| Oil Storage Container (indicate whether aboveground (A) or completely buried (B)) | Type of Oil | Shell Capacity (gallons) |
| D-1 (A) — double-wall steel shop-fabricated tank (UL 142 type) with interstitial monitor, high-level alarm and level gauge; fueling area | Diesel fuel | 5,000 |
| D-2 (A) — double-wall steel shop-fabricated tank (UL 142 type) with interstitial monitor, high-level alarm and level gauge; fueling area | Diesel fuel | 5,000 |
| Mobile/portable containers (A) — none of 55 gallons or more. Lubricants are kept in containers under 55 gallons (exempt, 112.1(d)(5)). | — | 0 |
| Completely buried tanks (B) — none | — | 0 |
| Total Aboveground Storage Capacityᶜ | 10,000 gallons | |
| Total Completely Buried Storage Capacity | 0 gallons | |
| Facility Total Oil Storage Capacity | 10,000 gallons | |
ᵃ Aboveground storage containers that must be included when calculating total facility oil storage capacity include: tanks and mobile or portable containers; oil-filled operational equipment (e.g., transformers); other oil-filled equipment, such as flow-through process equipment. Exempt containers that are not included in the capacity calculation include: any container with a storage capacity of less than 55 gallons of oil; containers used exclusively for wastewater treatment; permanently closed containers; motive power containers; hot-mix asphalt containers; heating oil containers used solely at a single-family residence; and pesticide application equipment or related mix containers.
ᵇ Although the criteria to determine eligibility for qualified facilities focuses on the aboveground oil storage containers at the facility, the completely buried tanks at a qualified facility are still subject to the rule requirements and must be addressed in the template; however, they are not counted toward the qualified facility applicability threshold.
ᶜ Counts toward qualified facility applicability threshold.
Not counted: the fuel tanks of the 12 fleet tractors and other vehicles are motive power containers (112.2; excluded by 112.1(d)(7)); propane forklift cylinders hold propane, which is not oil. Oil-filled operational equipment of 55 gallons or more: none at this facility.
2. Secondary Containment and Oil Spill Control (§§112.6(a)(3)(i) and (ii), 112.7(c) and 112.9(c)(2))
| Table G-3 Secondary Containment and Oil Spill Control | |
|---|---|
| Appropriate secondary containment and/or diversionary structures or equipmentᵃ is provided for all oil handling containers, equipment, and transfer areas to prevent a discharge to navigable waters or adjoining shorelines. The entire secondary containment system, including walls and floor, is capable of containing oil and is constructed so that any discharge from a primary containment system, such as a tank or pipe, will not escape the containment system before cleanup occurs. | ☒ |
ᵃ Use one of the following methods of secondary containment or its equivalent: (1) Dikes, berms, or retaining walls sufficiently impervious to contain oil; (2) Curbing; (3) Culverting, gutters, or other drainage systems; (4) Weirs, booms, or other barriers; (5) Spill diversion ponds; (6) Retention ponds; or (7) Sorbent materials.
Table G-4 below identifies the tanks and containers at the facility with the potential for an oil discharge; the mode of failure; the flow direction and potential quantity of the discharge; and the secondary containment method and containment capacity that is provided.
| Table G-4 Containers with Potential for an Oil Discharge | |||||
|---|---|---|---|---|---|
| Area | Type of failure (discharge scenario) | Potential discharge volume (gallons) | Direction of flow for uncontained discharge | Secondary containment methodᵃ | Secondary containment capacity (gallons) |
| Bulk Storage Containers and Mobile/Portable Containersᵇ | |||||
| D-1, fueling area | Inner tank leak or failure | 5,000 | Held by outer tank | Double-wall tank (outer shell); interstitial monitor | 5,000 (outer shell holds full inner tank; closed, no rainfall entry) |
| D-2, fueling area | Inner tank leak or failure | 5,000 | Held by outer tank | Double-wall tank (outer shell); interstitial monitor | 5,000 (same) |
| D-1 or D-2 | Overfill during delivery (out the vent or fill) | Up to 3,000 (one tank truck compartment) | South across the fueling pad to SI-3, Outfall 001 and Lake Tiberius | High-level alarm, gauge and attended delivery (prevention); SK-7 drain cover placed on SI-3 before delivery; boom and sorbents (SK-8) | Drain cover blocks SI-3; SK-8 sorbents and boom |
| Oil-filled Operational Equipment (e.g., hydraulic equipment, transformers)ᶜ | |||||
| None | — | — | — | — | — |
| Piping, Valves, etc. | |||||
| Aboveground supply piping, D-1/D-2 to DI-1 | Pipe, fitting or valve leak | Up to 100 (pump stopped by emergency fuel shutoff) | South to SI-3 | Emergency fuel shutoff; drain cover on SI-3; sorbents (SK-7) | Drain cover blocks SI-3; SK-7 sorbents |
| Product Transfer Areas (location where oil is loaded to or from a container, pipe or other piece of equipment.) | |||||
| Dispenser island DI-1 | Nozzle or hose failure; overfilled tractor tank; drive-off | Up to 100 | South across the pad to SI-3 | Emergency fuel shutoff; drain cover on SI-3 (SK-7); sorbent pads, socks and loose sorbent (SK-7) | Drain cover blocks SI-3; SK-7 sorbents |
| Fill port (delivery to D-1/D-2) | Delivery hose or coupling failure | Up to 3,000 (one compartment); most likely about 150 (attended shutoff within one minute) | South to SI-3 | Attended delivery; SK-7 drain cover placed on SI-3 before delivery starts; boom and sorbents (SK-8) | Drain cover blocks SI-3; SK-8 boom and sorbents |
| Other Oil-Handling Areas or Oil-Filled Equipment (e.g., flow-through process vessels at an oil production facility) | |||||
| None | — | — | — | — | — |
ᵃ Use one of the following methods of secondary containment or its equivalent: (1) Dikes, berms, or retaining walls sufficiently impervious to contain oil; (2) Curbing; (3) Culverting, gutters, or other drainage systems; (4) Weirs, booms, or other barriers; (5) Spill diversion ponds; (6) Retention ponds; or (7) Sorbent materials.
ᵇ For storage tanks and bulk storage containers, the secondary containment capacity must be at least the capacity of the largest container plus additional capacity to contain rainfall or other precipitation.
ᶜ For oil-filled operational equipment: Document in the table above if alternative measures to secondary containment (as described in §112.7(k)) are implemented at the facility.
Bulk storage container containment (112.6(a)(3)(ii)). D-1 and D-2 are double-wall tanks. Each outer shell encloses the entire capacity of its inner tank, and because the outer shell is closed it takes in no rainfall, so each tank provides secondary containment for the entire capacity of the largest single container plus precipitation. The interstitial space of each tank is monitored.
Transfer areas (112.7(c)). The fueling area is a concrete pad, curbed on the east, west and north sides; the south (drive-through) side is open and slopes toward SI-3. 112.7(c) allows containment to address the typical failure mode and the most likely quantity of oil discharged, and allows active measures. At the dispenser island the most likely discharge is a nozzle, hose or overfill spill stopped by the emergency fuel shutoff, held on the pad with the SK-7 drain cover over SI-3 and sorbents. At the fill port every delivery is attended by a trained Honey Badger employee, and the drain cover from SK-7 is placed over SI-3 before the hose is connected, so it is in place before any discharge can reach the inlet.
3. Inspections, Testing, Recordkeeping and Personnel Training (§§112.7(e) and (f), 112.8(c)(6) and (d)(4), 112.9(c)(3), 112.12(c)(6) and (d)(4))
| Table G-5 Inspections, Testing, Recordkeeping and Personnel Training | |
|---|---|
| An inspection and/or testing program is implemented for all aboveground bulk storage containers and piping at this facility. [§§112.8(c)(6) and (d)(4), 112.9(c)(3), 112.12(c)(6) and (d)(4)] | ☒ |
The following is a description of the inspection and/or testing program (e.g. reference to industry standard utilized, scope, frequency, method of inspection or test, and person conducting the inspection) for all aboveground bulk storage containers and piping at this facility: Industry standards. Steel Tank Institute STI SP001, Standard for the Inspection of Aboveground Storage Tanks (7th edition, 2024). D-1 and D-2 are shop-fabricated tanks of 1,101 to 5,000 gallons with secondary containment and a means of leak detection (double wall with interstitial monitor).
| |
| Inspections, tests, and records are conducted in accordance with written procedures developed for the facility. Records of inspections and tests kept under usual and customary business practices will suffice for purposes of this paragraph. [§112.7(e)] | ☒ |
| A record of the inspections and tests are kept at the facility or with the SPCC Plan for a period of three years. [§112.7(e)] [See Inspection Log and Schedule in Attachment 3.1] | ☒ |
| Inspections and tests are signed by the appropriate supervisor or inspector. [§112.7(e)] | ☒ |
| Personnel, training, and discharge prevention procedures [§112.7(f)] | |
| Oil-handling personnel are trained in the operation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility SPCC Plan. [§112.7(f)] | ☒ |
| A person who reports to facility management is designated and accountable for discharge prevention. [§112.7(f)] Name/Title: Ellen Ripley, Fleet & Fueling Supervisor (reports to Dawnn Perry, President) | ☒ |
| Discharge prevention briefings are conducted for oil-handling personnel annually to assure adequate understanding of the SPCC Plan for that facility. Such briefings highlight and describe past reportable discharges or failures, malfunctioning components, and any recently developed precautionary measures. [§112.7(f)] [See Oil-handling Personnel Training and Briefing Log in Attachment 3.4] | ☒ |
Oil-handling personnel at Building C are the Fleet & Fueling Supervisor, fueling attendants who attend fuel deliveries, shop mechanics, and the fleet drivers who fuel their own tractors at DI-1. Drivers are trained on the dispenser, the emergency fuel shutoff and the first steps in Table G-7 before they are issued a fueling card. Safety data sheets for diesel fuel and the shop lubricants are in the SDS binder in the dispatch office and on the plant document system from any terminal.
4. Security (excluding oil production facilities) §112.7(g)
| Table G-6 Implementation and Description of Security Measures | |
|---|---|
| Security measures are implemented at this facility to prevent unauthorized access to oil handling, processing, and storage area. | ☒ |
The following is a description of how you secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges:
| |
5. Emergency Procedures and Notifications (§112.7(a)(3)(iv) and 112.7(a)(5))
| Table G-7 Description of Emergency Procedures and Notifications |
|---|
The following is a description of the immediate actions to be taken by facility personnel in the event of a discharge to navigable waters or adjoining shorelines [§112.7(a)(3)(iv) and 112.7(a)(5)]: 1. Stop the flow. Hit the emergency fuel shutoff (EFS) on the east side of the fueling pad; it stops both dispensers at DI-1. During a delivery, the attendant and the driver stop the truck pump and close the truck valve. If there is fire or anyone is hurt, pull the fire alarm, call 911 and follow the Campus Emergency Action Plan (Rev. 4). 2. Protect SI-3. Put the drain cover from SK-7 (dispenser island) over SI-3 if it is not already in place. Use socks and boom from SK-7 or SK-8 (fill port) to stop the leading edge of the spill. Keep vehicles and people out of the spill and keep ignition sources away. 3. Call Ellen Ripley, Fleet & Fueling Supervisor, (555) 555-0130. If she is not on site, call the alternate, Hikaru Sulu, Dispatch Supervisor, (555) 555-0132. After hours, call the Perry Industries security officer at Gate 2, (555) 555-0112, who calls Ellen Ripley at home. 4. Clean up. Small spills on the pad (less than about 25 gallons and not near SI-3) are cleaned up by trained Honey Badger employees with SK-7 and SK-8. For anything larger, or any spill that reaches SI-3, Ellen Ripley calls Sheaves Environmental Response, (555) 555-0177, 24 hours. 5. Notify. If oil reaches Lake Tiberius or its shoreline, or gets into SI-3 and may reach the lake (SI-3 runs straight to Outfall 001 and the lake), Ellen Ripley (or Dawnn Perry) immediately calls the National Response Center, 1-800-424-8802, using the information in Table G-9 and the Discharge Notification Form in Attachment 4, then the state environmental spill line, (555) 555-0190. A discharge that causes a sheen, film or discoloration on the water or shoreline is a reportable discharge (40 CFR 110.3). If it is not clear whether oil has reached the water, make the call. 6. Disposal. Used sorbents, recovered fuel and contaminated soil go into closed, labeled drums or a Sheaves vacuum truck and are disposed of through Sheaves Environmental Response under applicable waste rules. Keep the shipping papers with the spill record. 7. Follow-up. Restock SK-7 and SK-8. Record the discharge, its cause and the fix, and cover it at the next annual briefing. Check Section 8 (112.4) to see whether a written report to EPA is required. Response equipment. SK-7 (dispenser island): cabinet with 2 booms, 50 pads, 10 socks, drain cover for SI-3 and shovel; absorbent capacity 55 gallons. SK-8 (fill port): 30-gallon kit with 25 pads and 4 socks; absorbent capacity 20 gallons. Kits are inspected monthly with the SPCC checklist and restocked by Ellen Ripley. |
6. Contact List (§112.7(a)(3)(vi))
| Table G-8 Contact List | |
|---|---|
| Contact Organization / Person | Telephone Number |
| National Response Center (NRC) | 1-800-424-8802 |
| Cleanup Contractor(s): Sheaves Environmental Response (Mike Sheaves), 24-hour spill cleanup | (555) 555-0177 |
| Key Facility Personnel | |
| Designated Person Accountable for Discharge Prevention: Ellen Ripley, Fleet & Fueling Supervisor | Office: (555) 555-0130 Emergency: (555) 555-0130 |
| Dawnn Perry, President, Honey Badger Logistics, LLC | Office: (833) 727-7699 Emergency: (833) 727-7699 |
| Hikaru Sulu, Dispatch Supervisor (alternate to Ellen Ripley) | Office: (555) 555-0132 Emergency: (555) 555-0132 |
| Mike Perry, Founder & Chief Awesomeness Officer, Perry Industries, Inc. (management) | Office: (440) 336-0262 Emergency: (440) 336-0262 |
| State Oil Pollution Control Agencies: state environmental spill line | (555) 555-0190 |
| Other State, Federal, and Local Agencies: New Mos Eisley Local Emergency Planning Committee; U.S. EPA Regional Administrator (regional office serving Tiberius County) (written 112.4 reports) | LEPC: (555) 555-0185 EPA Regional Administrator: written reports; copy to the state agency |
| Local Fire Department: New Mos Eisley Fire Department, Station 7 | Emergency: 911 Non-emergency: (555) 555-0180 |
| Local Police Department: New Mos Eisley Police Department | Emergency: 911 Non-emergency: (555) 555-0182 |
| Hospital: Tiberius Regional Medical Center | Emergency: 911 Main: (555) 555-0183 |
| Other Contact References (e.g., downstream water intakes or neighboring facilities): Perry Industries security officer, Gate 2 (24 hours); Building B control room (Perry’s Awesomeness Factory); fuel supplier Arrakis Fuel & Lubricants. Lake Tiberius receives SI-3 drainage through Outfall 001. | Gate 2 security: (555) 555-0112 (ext. 2) Building B control room: (555) 555-0110 (ext. 0) Perry Industries main office: (555) 555-0108 Arrakis Fuel & Lubricants: (555) 555-0165 |
7. NRC Notification Procedure (§112.7(a)(4) and (a)(5))
| Table G-9 NRC Notification Procedure | |
|---|---|
| In the event of a discharge of oil to navigable waters or adjoining shorelines, the following information identified in Attachment 4 will be provided to the National Response Center immediately following identification of a discharge to navigable waters or adjoining shorelines [See Discharge Notification Form in Attachment 4]: [§112.7(a)(4)] ☒ | |
|
|
8. SPCC Spill Reporting Requirements (Report within 60 days) (§112.4)
Submit information to the EPA Regional Administrator (RA) and the appropriate agency or agencies in charge of oil pollution control activities in the State in which the facility is located within 60 days from one of the following discharge events:
- A single discharge of more than 1,000 U.S. gallons of oil to navigable waters or adjoining shorelines or
- Two discharges to navigable waters or adjoining shorelines each more than 42 U.S. gallons of oil occurring within any twelve month period
You must submit the following information to the RA:
(1) Name of the facility;
(2) Your name;
(3) Location of the facility;
(4) Maximum storage or handling capacity of the facility and normal daily throughput;
(5) Corrective action and countermeasures you have taken, including a description of equipment repairs and replacements;
(6) An adequate description of the facility, including maps, flow diagrams, and topographical maps, as necessary;
(7) The cause of the reportable discharge, including a failure analysis of the system or subsystem in which the failure occurred; and
(8) Additional preventive measures you have taken or contemplated to minimize the possibility of recurrence
(9) Such other information as the Regional Administrator may reasonably require pertinent to the Plan or discharge
At this facility, Ellen Ripley prepares the report and Dawnn Perry signs it. The state agency receives a complete copy of the information sent to the RA (112.4(c)).
* * * * *
NOTE: Complete one of the following sections (A, B or C) as appropriate for the facility type.
This facility is an onshore facility (excluding production). Section A is completed. Sections B and C are not applicable.
A. Onshore Facilities (excluding production) (§§112.8(b) through (d), 112.12(b) through (d))
The owner or operator must meet the general rule requirements as well as requirements under this section. Note that not all provisions may be applicable to all owners/operators. For example, a facility may not maintain completely buried metallic storage tanks installed after January 10, 1974, and thus would not have to abide by requirements in §§112.8(c)(4) and 112.12(c)(4), listed below. In cases where a provision is not applicable, write “N/A”.
| Table G-10 General Rule Requirements for Onshore Facilities | |
|---|---|
| Drainage from diked storage areas is restrained by valves to prevent a discharge into the drainage system or facility effluent treatment system, except where facility systems are designed to control such discharge. Diked areas may be emptied by pumps or ejectors that must be manually activated after inspecting the condition of the accumulation to ensure no oil will be discharged. [§§112.8(b)(1) and 112.12(b)(1)] — No diked storage areas; D-1 and D-2 are double-wall tanks. | N/A |
| Valves of manual, open-and-closed design are used for the drainage of diked areas. [§§112.8(b)(2) and 112.12(b)(2)] — No diked areas. | N/A |
| The containers at the facility are compatible with materials stored and conditions of storage such as pressure and temperature. [§§112.8(c)(1) and 112.12(c)(1)] — Steel tanks built for diesel, atmospheric pressure, ambient temperature. | ☒ |
| Secondary containment for the bulk storage containers (including mobile/portable oil storage containers) holds the capacity of the largest container plus additional capacity to contain precipitation. Mobile or portable oil storage containers are positioned to prevent a discharge as described in §112.1(b). [§112.6(a)(3)(ii)] — Double-wall tanks (Section III.2). No mobile or portable containers of 55 gallons or more. | ☒ |
If uncontaminated rainwater from diked areas drains into a storm drain or open watercourse the following procedures will be implemented at the facility: [§§112.8(c)(3) and 112.12(c)(3)]
No diked areas at this facility. | N/A |
For completely buried metallic tanks installed on or after January 10, 1974 at this facility [§§112.8(c)(4) and 112.12(c)(4)]:
No completely buried tanks. | N/A |
For partially buried or bunkered metallic tanks [§112.8(c)(5) and §112.12(c)(5)]:
No partially buried or bunkered tanks. | N/A |
| Each aboveground bulk container is tested or inspected for integrity on a regular schedule and whenever material repairs are made. Scope and frequency of the inspections and inspector qualifications are in accordance with industry standards. Container supports and foundations are regularly inspected. [See Inspection Log and Schedule and Bulk Storage Container Inspection Schedule in Attachments 3.1 and 3.2] [§112.8(c)(6) and §112.12(c)(6)(i)] | ☒ |
| Outsides of bulk storage containers are frequently inspected for signs of deterioration, discharges, or accumulation of oil inside diked areas. [See Inspection Log and Schedule in Attachment 3.1] [§§112.8(c)(6) and 112.12(c)(6)] | ☒ |
| For bulk storage containers that are subject to 21 CFR part 110 which are shop-fabricated, constructed of austenitic stainless steel, elevated and have no external insulation, formal visual inspection is conducted on a regular schedule. Appropriate qualifications for personnel performing tests and inspections are documented. [See Inspection Log and Schedule and Bulk Storage Container Inspection Schedule in Attachments 3.1 and 3.2] [§112.12(c)(6)(ii)] | N/A |
Each container is provided with a system or documented procedure to prevent overfills for the container. Describe:
| ☒ |
| Liquid level sensing devices are regularly tested to ensure proper operation [See Inspection Log and Schedule in Attachment 3.1]. [§112.6(a)(3)(iii)] — Test-button check before every delivery; full function test annually. | ☒ |
| Visible discharges which result in a loss of oil from the container, including but not limited to seams, gaskets, piping, pumps, valves, rivets, and bolts are promptly corrected and oil in diked areas is promptly removed. [§§112.8(c)(10) and 112.12(c)(10)] | ☒ |
| Aboveground valves, piping, and appurtenances such as flange joints, expansion joints, valve glands and bodies, catch pans, pipeline supports, locking of valves, and metal surfaces are inspected regularly. [See Inspection Log and Schedule in Attachment 3.1] [§§112.8(d)(4) and 112.12(d)(4)] | ☒ |
| Integrity and leak testing are conducted on buried piping at the time of installation, modification, construction, relocation, or replacement. [See Inspection Log and Schedule in Attachment 3.1] [§§112.8(d)(4) and 112.12(d)(4)] — All supply piping from D-1 and D-2 to DI-1 is aboveground. No buried piping. | N/A |
B. Onshore Oil Production Facilities (excluding drilling and workover facilities) (§112.9(b), (c), and (d))
Not applicable. Building C is not an oil production facility. Table G-11 (General Rule Requirements for Onshore Oil Production Facilities) is not completed.
C. Onshore Oil Drilling and Workover Facilities (§112.10(b), (c) and (d))
Not applicable. Building C is not an oil drilling or workover facility. Table G-12 (General Rule Requirements for Onshore Oil Drilling and Workover Facilities) is not completed.
ATTACHMENT 1Five Year Review and Technical Amendment Logs
Attachment 1.1 — Five Year Review Log
I have completed a review and evaluation of the SPCC Plan for this facility, and will/will not amend this Plan as a result.
| Table G-13 Review and Evaluation of SPCC Plan for Facility | |||
|---|---|---|---|
| Review Date | Plan Amendment: Will Amend | Plan Amendment: Will Not Amend | Name and signature of person authorized to review this Plan |
| March 22, 2021 | ☒ | ☐ | Dawnn Perry, President |
| January 12, 2026 | ☒ | ☐ | Dawnn Perry, President |
| Due by January 12, 2031 | ☐ | ☐ | |
| ☐ | ☐ | ||
| ☐ | ☐ | ||
| ☐ | ☐ | ||
Attachment 1.2 — Technical Amendment Log
Any technical amendments to this Plan will be re-certified in accordance with Section I of this Plan template.
| Table G-14 Description and Certification of Technical Amendments | ||
|---|---|---|
| Review Date | Description of Technical Amendment | Name and signature of person certifying this technical amendment |
ATTACHMENT 2Oil Spill Contingency Plan and Checklist
An oil spill contingency plan and written commitment of resources is required for:
- Flowlines and intra-facility gathering lines at oil production facilities and
- Qualified oil-filled operational equipment which has no secondary containment.
| An oil spill contingency plan meeting the provisions of 40 CFR part 109, as described below, and a written commitment of manpower, equipment and materials required to expeditiously control and remove any quantity of oil discharged that may be harmful is attached to this Plan. | N/A |
Not applicable to this facility. Building C is not an oil production facility and has no oil-filled operational equipment, so no contingency plan under 40 CFR part 109 is required and the checklist below is not completed. If oil-filled operational equipment without secondary containment is added and the 112.7(k) alternative is used, this attachment will be completed.
Complete the checklist below to verify that the necessary operations outlined in 40 CFR part 109 - Criteria for State, Local and Regional Oil Removal Contingency Plans - have been included.
| Table G-15 Checklist of Development and Implementation Criteria for State, Local and Regional Oil Removal Contingency Plans (§109.5)ᵃ | |
|---|---|
| (a) Definition of the authorities, responsibilities and duties of all persons, organizations or agencies which are to be involved in planning or directing oil removal operations. | ☐ |
| (b) Establishment of notification procedures for the purpose of early detection and timely notification of an oil discharge including: | |
| (1) The identification of critical water use areas to facilitate the reporting of and response to oil discharges. | ☐ |
| (2) A current list of names, telephone numbers and addresses of the responsible persons (with alternates) and organizations to be notified when an oil discharge is discovered. | ☐ |
| (3) Provisions for access to a reliable communications system for timely notification of an oil discharge, and the capability of interconnection with the communications systems established under related oil removal contingency plans, particularly State and National plans (e.g., NCP). | ☐ |
| (4) An established, prearranged procedure for requesting assistance during a major disaster or when the situation exceeds the response capability of the State, local or regional authority. | ☐ |
| (c) Provisions to assure that full resource capability is known and can be committed during an oil discharge situation including: | |
| (1) The identification and inventory of applicable equipment, materials and supplies which are available locally and regionally. | ☐ |
| (2) An estimate of the equipment, materials and supplies which would be required to remove the maximum oil discharge to be anticipated. | ☐ |
| (3) Development of agreements and arrangements in advance of an oil discharge for the acquisition of equipment, materials and supplies to be used in responding to such a discharge. | ☐ |
| (d) Provisions for well defined and specific actions to be taken after discovery and notification of an oil discharge including: | |
| (1) Specification of an oil discharge response operating team consisting of trained, prepared and available operating personnel. | ☐ |
| (2) Predesignation of a properly qualified oil discharge response coordinator who is charged with the responsibility and delegated commensurate authority for directing and coordinating response operations and who knows how to request assistance from Federal authorities operating under existing national and regional contingency plans. | ☐ |
| (3) A preplanned location for an oil discharge response operations center and a reliable communications system for directing the coordinated overall response operations. | ☐ |
| (4) Provisions for varying degrees of response effort depending on the severity of the oil discharge. | ☐ |
| (5) Specification of the order of priority in which the various water uses are to be protected where more than one water use may be adversely affected as a result of an oil discharge and where response operations may not be adequate to protect all uses. | ☐ |
| (6) Specific and well defined procedures to facilitate recovery of damages and enforcement measures as provided for by State and local statutes and ordinances. | ☐ |
ᵃ The contingency plan must be consistent with all applicable state and local plans, Area Contingency Plans, and the National Contingency Plan (NCP).
ATTACHMENT 3Inspections, Dike Drainage and Personnel Training Logs
Attachment 3.1 — Inspection Log and Schedule
This log is intended to document compliance with §§112.6(a)(3)(iii), 112.8(c)(6), 112.8(d)(4), 112.9(b)(2), 112.9(c)(3), 112.9(d)(1), 112.9(d)(4), 112.12(c)(6), and 112.12(d)(4), as applicable.
Schedule for this facility: monthly visual inspection of D-1, D-2, piping, valves, dispensers, fill port, interstitial monitors, gauges, pad, SI-3 area, spill kits SK-7 and SK-8, and security lighting (STI SP001 monthly items); annual inspection with alarm and EFS function tests (STI SP001 annual items); test-button check of the high-level alarm before each delivery (delivery log).
| Table G-16 Inspection Log and Schedule | |||||
|---|---|---|---|---|---|
| Date of Inspection | Container / Piping / Equipment | Describe Scope (or cite Industry Standard) | Observations | Name/ Signature of Inspector | Records maintained separatelyᵃ |
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
| ☐ | |||||
ᵃ Indicate in the table above if records of facility inspections are maintained separately at this facility. (The SP001 monthly and annual checklists, kept in the dispatch office binder, are the separate records for this facility.)
Attachment 3.2 — Bulk Storage Container Inspection Schedule – onshore facilities (excluding production)
To comply with integrity inspection requirement for bulk storage containers, inspect/test each shop-built aboveground bulk storage container on a regular schedule in accordance with a recognized container inspection standard based on the minimum requirements in the following table.
| Table G-17 Bulk Storage Container Inspection Schedule | |
|---|---|
| Container Size and Design Specification | Inspection requirement |
| Portable containers (including drums, totes, and intermodal bulk containers (IBC)) | Visually inspect monthly for signs of deterioration, discharges or accumulation of oil inside diked areas |
| 55 to 1,100 gallons with sized secondary containment; 1,101 to 5,000 gallons with sized secondary containment and a means of leak detectionᵃ | Visually inspect monthly for signs of deterioration, discharges or accumulation of oil inside diked areas plus any annual inspection elements per industry inspection standards |
| 1,101 to 5,000 gallons with sized secondary containment and no method of leak detectionᵃ | Visually inspect monthly for signs of deterioration, discharges or accumulation of oil inside diked areas, plus any annual inspection elements and other specific integrity tests that may be required per industry inspection standards |
ᵃ Examples of leak detection include, but are not limited to, double-walled tanks and elevated containers where a leak can be visually identified.
Applied to this facility: D-1 and D-2 are 5,000-gallon shop-built tanks with sized secondary containment and a means of leak detection (double wall with interstitial monitor). Inspection requirement: monthly visual inspection plus the annual inspection elements of STI SP001. SP001 Category 1 (double wall with interstitial monitoring): formal external inspection every 20 years; last formal external inspection March 24, 2021 (Arrakis Fuel & Lubricants service report); next due March 2041. Additional formal inspection or test interval set by SP001 for these tanks: none beyond the 20-year formal external inspection.
Attachment 3.3 — Dike Drainage Log
Not applicable. This facility has no diked areas; D-1 and D-2 are double-wall tanks. The log is kept in the Plan in case a diked area is added.
| Table G-18 Dike Drainage Log | ||||||
|---|---|---|---|---|---|---|
| Date | Bypass valve sealed closed | Rainwater inspected to be sure no oil (or sheen) is visible | Open bypass valve and reseal it following drainage | Drainage activity supervised | Observations | Signature of Inspector |
| ☐ | ☐ | ☐ | ☐ | |||
| ☐ | ☐ | ☐ | ☐ | |||
| ☐ | ☐ | ☐ | ☐ | |||
| ☐ | ☐ | ☐ | ☐ | |||
Attachment 3.4 — Oil-handling Personnel Training and Briefing Log
| Table G-19 Oil-Handling Personnel Training and Briefing Log | ||
|---|---|---|
| Date | Description / Scope | Attendees |
ATTACHMENT 4Discharge Notification Form
In the event of a discharge of oil to navigable waters or adjoining shorelines, the following information will be provided to the National Response Center [also see the notification information provided in Section 7 of the Plan]:
| Table G-20 Information provided to the National Response Center in the Event of a Discharge | |||
|---|---|---|---|
| Discharge/Discovery Date | Time | ||
| Facility Name | Honey Badger Logistics, LLC (Building C) | ||
| Facility Location (Address/Lat-Long/Section Township Range) | 1 Perry Parkway, New Mos Eisley 00042, Tiberius County (Gate 3); north shore of Lake Tiberius, approx. 41.00 N, 81.00 W | ||
| Name of reporting individual | Telephone # | ||
| Type of material discharged | Estimated total quantity discharged | Gallons/Barrels: ________ | |
| Source of the discharge | Media affected | ☐ Soil ☐ Water (specify) ________ ☐ Other (specify) ________ | |
| Actions taken | |||
| Damage or injuries | ☐ No ☐ Yes (specify) | Evacuation needed? | ☐ No ☐ Yes (specify) |
| Organizations and individuals contacted | ☐ National Response Center 800-424-8802 Time ________ ☐ Cleanup contractor (Specify) Sheaves Environmental Response Time ________ ☐ Facility personnel (Specify) ______________ Time ______ ☐ State Agency (Specify) State spill line (555) 555-0190 Time ________ ☐ Other (Specify) ______________ Time ______ | ||
ATTACHMENT 5Facility Diagram (supplemental)
Figure 1 — Facility Diagram, Building C (drawing PI-C-201). Not required by the Tier I template; included for response use. Storm sewer and Outfall 001: campus site plan PI-C-001.
ATTACHMENT 6Certification of the Applicability of the Substantial Harm Criteria
40 CFR 112.20(e) requires an owner or operator who determines that the facility does not meet the substantial harm criteria to complete and keep at the facility the certification form in Appendix C to Part 112 (Attachment C-II). The questions and certification below are from that form. The basis for each answer is given in italics.
| Facility Name | Honey Badger Logistics, LLC (Building C) |
| Facility Address | 1 Perry Parkway, New Mos Eisley (Gate 3) |
1. Does the facility transfer oil over water to or from vessels and does the facility have a total oil storage capacity greater than or equal to 42,000 gallons? Basis: no oil is transferred over water to or from vessels; total oil storage capacity is 10,000 gallons. | Yes ___ No X |
2. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and does the facility lack secondary containment that is sufficiently large to contain the capacity of the largest aboveground oil storage tank plus sufficient freeboard to allow for precipitation within any aboveground oil storage tank area? Basis: total oil storage capacity is 10,000 gallons, below 1 million gallons. (D-1 and D-2 are double-wall tanks.) | Yes ___ No X |
3. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and is the facility located at a distance (as calculated using the appropriate formula in Attachment C-III to this appendix or a comparable formula) such that a discharge from the facility could cause injury to fish and wildlife and sensitive environments? For further description of fish and wildlife and sensitive environments, see Appendices I, II, and III to DOC/NOAA’s “Guidance for Facility and Vessel Response Plans: Fish and Wildlife and Sensitive Environments” (see appendix E to this part, section 13, for availability) and the applicable Area Contingency Plan. Basis: total oil storage capacity is 10,000 gallons, below 1 million gallons, so the distance calculation does not apply. | Yes ___ No X |
4. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and is the facility located at a distance (as calculated using the appropriate formula in Attachment C-III to this appendix or a comparable formula) such that a discharge from the facility would shut down a public drinking water intake? Basis: total oil storage capacity is 10,000 gallons, below 1 million gallons. | Yes ___ No X |
5. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and has the facility experienced a reportable oil discharge in an amount greater than or equal to 10,000 gallons within the last 5 years? Basis: total oil storage capacity is 10,000 gallons, below 1 million gallons; no reportable discharge in the last 5 years. | Yes ___ No X |
Certification
I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document, and that based on my inquiry of those individuals responsible for obtaining this information, I believe that the submitted information is true, accurate, and complete.
| Signature: | |
| Name (please type or print): | Dawnn Perry |
| Title: | President, Honey Badger Logistics, LLC |
| Date: | January 12, 2026 |